After the 100 kW Low Delta load banks approved early 2019 to test large IT room up to 4 MW (London, Paris), Rentaload reinforced its new generation range of connected load banks adding a large fleet of 200/300 connected load banks. All combined the total load capacity available for the on-site test is now over 50 MW with a wide range of offers starting from rackable solutions (6 or 7 kW low delta T load banks) up to 300 kW connected load banks. Aiming at bringing more and more added value in this commissioning phase, Rentaload team keeps on building a strong European network with local installers to provide additional on-site services.