We were contacted by Bouygues Energie et Services to carry out tests for a new Parisian data center and thus check the performance of the equipment and that of the computer rooms.

We have therefore rented them 210 load banks of 21 kW with a first phase in double chain and a second phase in single chain as well as all the equipment enabling them to be connected from the planned departures. As you can see, this was an important project! (2 rooms of 2MW simultaneously, 5 rooms in total on several floors, with tests for more than 3 months). And we are very proud to have participated in it.

Our client, Steve BARDET, project manager at “Bouygues Energie et Services” , gave us a very nice testimonial following the service provided by Rentaload. And in relation to this performance, he highlighted several positive points:

  • our responsiveness (express transport, defective equipment replaced immediately at no additional cost, etc.).
  • our commitment
  • our logistic support
  • our support on the different developments and the different phases of the project

The tests went well and we are delighted that our client was satisfied with the service provided.

> If you also need to carry out load tests, do not hesitate to contact us, we will present our products, our services and we will offer you our best offer! And if you have any questions about our activity or about a project of this type, do not hesitate to contact us: contact@rentalaod.com.

In the meantime, we invite you to discover the full range of our load banks HERE.

Share This Story, Choose Your Platform!