20 June 2014
References in the rental of load banks
Rentaload has a long experience in load bank rental on many projects. Below are examples of recent projects
Reference – Example of a computer room recipe project
- Customer : EDF OS
- Project duration : 10 days
- Type of products rented : 21kW rack bench
- Description : Acceptance of a large computer room of 2MW in the Sude Paris Test of air conditioning & adjustment for electricity consumption over several days. Validation of the electrical recovery diagram by the emergency network of the room and the building (UPS, generator). overall validation of the test protocol before delivery to the end customer. construction of containment island to be close to reality.
Reference – Sample project: data center recipe server simulator
- Customer : Schneider IT-APC
- Project duration : 5 days
- Type of products rented : 7kW rack bench + C19-C20 PDUs cables
- Description : Acceptance of a small computer room in the center of Paris (2nd arrondissement) before the production of 6 server bays. Air conditioning test & adjustment for an electrical consumption of 40kW over several days. Validation of the electrical recovery diagram by the emergency network of the room and the building (UPS, generator). global validation of the test protocol before delivery to the end customer
Reference – Example of battery discharge test project
- Customer : HUAWEI-LCIE
- Project duration : 1 week
- Type of products rented : DC 48V – 500A discharge bench
- Description : Performing tests on batteries and inverters before final installation in a building. Delivery of a 48V-400A bench and a 48V-100A bench with cables. Coupling of benches and connection to electrical equipment.
Reference – Example of a data center energy audit project
- Client : APL
- Project duration : 8 days
- Type of products rented : 18 x 7kW rack load banks
- Description : Realization of long-term thermal tests on a containment island of the new Sigma data center in Carquefou . The service includes the rental of 18 load banks with the associated cables, delivery on site, installation and connection of the banks, dismantling and return delivery. APL was in charge of the project.
Reference – Example of a generating set test campaign project
- Client : Compagnie Nationale Rhône (CNR)
- Duration of the project : Test campaign over 3 months
- Type of products rented : Inductive bench 671kVA
- Description : Realization of a test campaign on 35 generators from 100kVa to 900kVa in the Rhone valley on hydraulic infrastructures. Installation of the bench, connection to GE & installation. Test & audit with a control body, report writing. Itinerant campaign with management of the test schedule according to customer needs.
Customer references for load bank rental
Share This Story, Choose Your Platform!