26 January 2022

Customer story: Group IPS (March 2021)

We collaborated in March 2021, with one of the project engineers of the IPS Group in Belgium, on a Data Center project.

To meet their needs, we rented them 6 kW SMART rack load banks with the associated connectors and set up a temporary containment solution so that they could carry out their tests in the best possible conditions. We also took care of all the installation on site.

It was therefore a turnkey service which won over our client and enabled him to save time by concentrating solely on the load tests. Moreover, the tests (electrical and thermal) went very well and our client underlined the performance and efficiency of our equipment in its test phase.

We are therefore very happy to see our client satisfied and a big thank you to him for giving us his feedback following our service.

The positive points noted by our client:
– a personalized, tailor-made solution
– quick and efficient installation of the temporary containment solution
– good quality equipment
– securing the tests thanks to the spares provided on site (to react in the event of a problem)

If you also need to carry out load tests, do not hesitate to contact us ; we will discuss your needs together and we will offer you our best offer!

In the meantime, we invite you to discover the full range of Rentaload load banks HERE.

Share This Story, Choose Your Platform!