1. THE 200 kW LOW DELTA T LOAD BANK

Dedicated to large Data Halls, the new 200 kW load banks offer a low delta T of 35K at full power, which avoids any damage to the room and the direct environment during commissioning tests. This low delta T is also similar to that of our 21 kW load banks, allowing for better heat distribution in the room (see specifications for our new 21 kW connected load banks HERE ). These SMART load banks can also be managed using Rentaload monitoring software to simplify and reduce uptime.200 KW

“SMART solutions to reduce lead times and make Commissioning more efficient”

Characteristics :
– The lowest Delta T available on the market
– Easy connection thanks to Powerlocks
– Connected load banks to remotely operate and manage an entire fleet of load banks and collect data during commissioning tests
– Vertical airflow deflector available as an accessory
– Reduced dimensions (width: 77 cm) + small wheels for easy handling

FOR MORE INFORMATION, CONTACT US AT THE FOLLOWING ADDRESS: contact@rentaload.com

2. THE 650 kW LOAD BANK

The new 650 kW load banks offer an easy plug-and-play solution, equipped with Powerlock sockets; connection is easy, especially when using our standard 20 meter long cables, also fitted with Powerlock connectors.
With the possibility of connecting up to 48 load banks at the same time, several load banks can easily be used in “block” to provide a total power of several MW.

banc de charge 650 kW

“A plug-and-play solution for 650 KW load bank ‘blocks'”

Characteristics :
– Up to 48 load banks connected simultaneously to form “blocks” of several MW
– Plug-and-play connection
– Units on wheels on the ground for easy handling

FOR MORE INFORMATION, CONTACT US AT THE FOLLOWING ADDRESS: contact@rentaload.com

3. TEMPORARY DISTRIBUTION PANEL FOR 100/200/300 kW LOW DELTA T BENCHES

To limit cable deployment when testing large data rooms, temporary distribution boards are a perfect aid. Thanks to this new accessory, commissioning teams can save up to 50% of cables, time and human resources.
As with our 650kW load banks (see our new 650kW specification above), these distribution boards are all fitted with a Powerlock socket providing an easy plug-and-play solution and electrical protection adjustable up to 1000A.
A solution that can be adjusted to each Datacentre electrical infrastructure depending on the configuration of the main distribution board.

tableau de distribution temporaire

“A plug-and-play solution on distribution boards”.

Characteristics :
– Plug-and-play connection
– Includes circuit breaker (up to 1000A)
– Units on wheels on the ground for easy handling

FOR MORE INFORMATION, CONTACT US AT THE FOLLOWING ADDRESS: contact@rentaload.com

4. SUPERVISION SOFTWARE FOR 100/200/300/650 kW LOW DELTA T BENCHES

Groups of multiple load bank types are easily managed with our supervision software, allowing commissioning teams to operate the entire fleet and collect and record data.
Cycle tests/scenarios, depending on the commissioning script, can be configured in the supervision software to speed up the transition period between tests.

bancs de charge connectés

“Supervision software to optimize your testing and commissioning phase”

Characteristics :
– Plug-and-play solution
– Software that allows to direct and manage a whole fleet of interconnected load banks
– Data collection and recording
– Programming cycle tests/scenarios
– Reduction of the number of people on site – Covid19
– Saving time (20%) and money

FOR MORE INFORMATION, CONTACT US AT THE FOLLOWING ADDRESS: contact@rentaload.com

> Discover the other 4 products in the article “8 new products at Rentaload in 2020 (part 1)”.

Share This Story, Choose Your Platform!