We worked with a major Data Center supplier in France on the “Test and Commissioning” phase.
With test powers of 3.4 MW and different types of load banks:
We have implemented a temporary containment solution . It is a solution that allows you to simulate the presence of racks in a room where they have not yet been installed to test both the ventilation and the electrical system with the possibility of testing two systems at the same time thanks to load banks of 21 KW or 7kW rackable.
Discover below the case study attached to this large “Data Center” project.